Protective kerbs at Bickleigh Bridge to be replaced

News Desk
Authored by News Desk
Posted: Friday, March 26, 2021 - 22:53

Urgent repairs are to be carried out to install new protective kerbstones at Bickleigh Bridge in Mid Devon next month (April).

The A396 will be closed at Bickleigh Bridge for five days from Monday 12 April to Friday 16 April while the "anti-climb" kerbs on the approach to the Grade II listed structure are replaced.

The specially designed kerbs, which were first introduced at the bridge in 2009, help guide larger vehicles safely over the bridge to prevent collisions with the ancient structure.

They have successfully reduced the amount of times the bridge has been struck by vehicles. However, the kerbstones now need to be replaced as they have sustained severe damage over the years and in their current condition larger vehicles can easily mount them and potentially damage the bridge.

Due to the narrow width of the bridge, the bridge needs to be fully closed to enable the work to be carried out safely. The approaches south of the A3072 junction up to the bridge will also be closed while the repairs are undertaken.

A signed diversion will be in place via the A3072 to Crediton through Lords Meadow to Tesco Roundabout, to the A377, to Cowley Bridge and A396 to Bickleigh.

Tags